The cute little digger, excavating the U-shaped retaining wall |
This will be the front of the retaining wall, running east-west across the block |
Digging the foundations |
Preparing the foundations for the block wall |
This section steps back under the garage slab |
The big digger. At this stage the builders were waiting for the concrete truck to pour concrete into the block wall foundations |
And the block wall is up! |
The corner cutting back in under the garage |
Waiting to be waterproofed and backfilled |
Our driveway will go where I'm standing, and run up to the garage. The slab will sit on top of the retained square. |
Hopefully our back retaining wall (Retaining Wall #2) will start soon too and run concurrently with continuing site works (digging the piers and our side retaining walls). Hurrah for progress!