Monday 2 September 2013

Second Floor Joists and the Massive Garage Beam

More great progress today, I could get used to this :)

The second floor joists were started today, along with some exterior boards and last, but not least, the huge steel beam running across the centre of the garage. In the initial plans we had a steel pole supporting the garage beam (as the garage is wider than a normal two car garage), however our clever site foreman came up with a solution which meant that we could remove the post and consequently enjoy an unfettered space!

Some pictures from toady:
















I wonder if we will see a second story this week? I have my fingers crossed :) 